 | Six voltage inputs necessary for loop scheme designs |
 | Full line metering capabilities using the voltage inputs from the internal sensors |
 | Programming to recognize seasonal loads and shift between three phase an single phase trip/close modes for optimal system efficiency |
 | In a loop scheme application, the control can be programmed to act as a recloser "looking" in either direction |
 | Minimum trip for phase, ground and sensitive earth faults |
 | Capable of up to four shots to lockout |
 | Sequence coordination |
 | Harmonics up to the 15th for the THD analysis |
 | Cold load pickup |